Barry, Cardiff, Newport & River Usk
| DOCKING | |||||||||||
|
| |||||||||||
|
Barry |
Cardiff |
Newport |
Alpha |
Bird Port | |||||||
|
Lady Windsor Lock |
Basin |
|
|
|
| ||||||
|
To Lock |
In Dock |
To Lock |
In Dock |
To Lock |
In Dock |
To Lock |
In Dock |
To Berth |
To Berth | ||
|
See Note (a) |
|
|
|
|
|
| |||||
|
Less than 3,000 gt |
1 |
|
1 |
1 |
|
|
|
|
|
| |
|
3,000 to 5,000 gt |
1 |
1 |
2 |
2 |
1 |
1 |
1 |
1 |
1 |
1 (c) | |
|
5,000 to 10,000 gt |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
1 (c) | |
|
More than 10,000 gt |
2 |
2 |
2 |
2 |
3 |
2 |
3 |
2 |
2 |
| |
|
|
SAILING | ||||||||||
|
|
Barry |
Cardiff |
Newport |
Alpha |
Bird Port | ||||||
|
Lady Windsor Lock |
Basin |
|
|
|
|
|
| ||||
|
In Dock |
To Sea |
In Dock |
To Sea |
In Dock |
To Sea |
In Dock |
To Sea |
To Sea |
To Sea | ||
|
Less than 3,000 gt |
|
|
|
|
|
|
|
|
|
| |
|
3,000 to 5,000 gt |
1 |
|
1 |
|
1 |
|
1 |
|
1 |
1 | |
|
5,000 to 10,000 gt |
2 |
1 |
2 |
1 |
2 |
1 |
2 |
1 |
2 |
1 | |
|
More than 10,000 gt |
2 |
1 |
2 |
1 |
2 |
2 (b) |
2 |
2 (b) |
2 |
| |
|
Notes |
| ||||||||||
|
|
Denotes that in calm weather a vessel with a fully operational bow thruster should not require tug assistance | ||||||||||
|
a |
Vessels carrying chemicals in bulk must engage a tug for their first visit to the Port of Barry. | ||||||||||
|
b |
The number of bow tugs may be reduced from two (2) to one (1) if the bow tug is tractor tug of more than 40 tonnes bollard pull. Ship's lines used as bow lines must have a valid test certificate and be designed for the task. | ||||||||||
|
c |
If the beam of a vessel entering Bird port is more than 17.5 metres two (2) tugs will be required. | ||||||||||
